Cidiki Enterprises

Golen Gol HPP

The Allai Khwar Hydropower Project is located on the left tributary of the Indus River, near Besham in the District of Battagram, Khyber Pakhtunkhwa. The project features a dam with a height of 32.5 meters and a headrace tunnel extending 2,366 meters. It has an installed capacity of 121 MW, generating an estimated annual energy output of 463 GWh. The project utilizes a gross head of 697 meters.The construction contract was awarded to DEC Astron and VA Tech.