Cidiki Enterprises

Jinnah HPP

The Jinnah Hydropower Project is situated on the right side of the existing Jinnah Barrage, approximately 5 km from Kalabagh town in District Mianwali, and 234 km from Islamabad. The project has an installed capacity of 96 MW and generates a mean annual energy of 688 GWh. It is designed to handle a discharge of 2,400 m³/sec, with a gross head of 4.88 meters. The facility is equipped with eight pit-type turbines.

Jinnah